Modelling Control Loop in a Water Injection System

Background

An engineering company can be requested to conduct a study into the controllability of a water injection system as well as pressure surge analysis. PIPENET Transient Module can perform both water hammer calculations and control systems modelling together, which saves a lot of engineers’ time and effort as they do not need to develop multiple models and conduct simulations using various software tools.

The schematic below shows a water injection system with a control loop for the overboard dump valve. For the sake of clarity, the control loop has been highlighted in red.

To read the full case study, please log in or register below.

Existing Users Log In
   

Other PIPENET Oil & Gas Applications

2023-10-20T14:22:46+00:00
Go to Top